| |
- OPERATOR'S AND ORGANIZATIONAL MAINTENANCE MANUAL
- WARNING
- TABLE OF CONTENTS
- TABLE OF CONTENTS
- LIST OF ILLUSTRATIONS
- CHAPTER 1 INTRODUCTION
- Description of Equipment
- Differences Between Subsystem
- Figure 1-1 . Frequency Conversion Subsystem (sheet I of 3).
- Figure 1-1. Frequency conversion Subsystem (sheet 2 of 3).
- Figure 1-1(3). Frequency Conversion Subsystem (sheet 3 of 3).
- Table 1-1. Major Component, Frequency Conversion Subsystem
- Official Nomenclature and Common Names.
- CHAPTER 2 SERVICE UPON RECEIPT AND INSTALLATION
- Figure 2-1. Typical cabinet packing diagram
- Figure 2-2. Typical triple-up and triple-down converter packing diagram
- Figure 2-3. Typical triple frequency synthesizer packing diagram.
- Table 2-5. Frequency Conversion Subsystem Unit 1 Intraconnections
- Table 2-6. Frequency Conversion Subsystem Unit 2 Intraconnections
- Table 2-7. Frequency Conversion Subsystem Interunit Connections
- CHAPTER 3 OPERATING INSTRUCTIONS
- Figure 3-1. Converters, Frequency, Electronic CV-3084/MSC-46(V) and CV-3084A/MSC-46(V), controls and indicators
- Table 3-2. Converters, Frequency, Electronic CV-085/MSC-46(V) and CV-3085A/MSC-46(V) Controls and Indicators.
- Table 3-4. Test Translator Controls and Indicators
- Figure 3-2. Converters, Frequency, Electronic CV-3085/MSC-46(V) and CV-3085A/MSC-46(V), controls and indicators
- Table 3-5.Amplifier, Radio Frequency AM-6631/MSC-46(V) Controls and Indicators
- Figure 3-3 (2). Synthesizer, Electrical Frequency O - 1658/MSC - 46(V) controls and indicators (sheet 2 of 2)
- Figure 3-4. Test translator, controls and indicators
- Figure 3-5 1. Amplifier, Radio Frequency AM - 6631/MSC - 46(V), controls and indicators (sheet 1 of 2)
- Figure 3-5 (2). Amplifier, Radio Frequency AM - 6631/MSC - 46(V), controls and indicators (sheet 2 of 2).
- Table 3- 7. Equalizer, Group Delay CN-1425/MSC-46(V) Controls and Indicators.
- Table 3-8. Time Base Patch Pane Interconnection and Test Points
- Figure 3-8. Time base patch panel interconnection and test points
- Figure 3-9. Cabinet interconnection and test points.
- Section II. PRELIMINARY ADJUSTMENT OF EQUIPMENT
- Preliminary Subsystem Test
- Preliminary Subsystem Test-CONT.
- Section III. OPERATION
- Figure 3-10. Preliminary subsystem test setup diagram
- Starting Procedure
- Procedure for Changing Frequency
- Up-Converter Input Signal Level Change Procedure
- Section IV. EMERGENCY OPERATION PROCEDURES
- CHAPTER 4 ORGANIZATIONAL MAINTENANCE
- Replacement of Fuses
- Organizational Monthly Preventive Maintenance Checks and Services Chart
- APPENDIX A REFERENCES
- APPENDIX C MAINTENANCE ALLOCATION
- Tool and Test Equipment Requirements (Table C-1)
- SECTION II. MAINTENANCE ALLOCATION CHART
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- SECTION II. MAINTENANCE ALLOCATION CHART-CONT.
- TABLE C-1 TOOL AND TEST EQUPMENT REQIUREMENTS
- TABLE C-1 TOOL AND TEST EQUPMENT REQIUREMENTS
- Table C-1 TOOL AND TEST EQUIPMENT REQUIREMENTS- continued
- Table C-1 TOOL AND TEST EQUIPMENT REQUIREMENTS- continued
- Table C-1 TOOL AND TEST EQUIPMENT REQUIREMENTS- continued
- Table C-1 TOOL AND TEST EQUIPMENT REQUIREMENTS- continued
- Table C-1 TOOL AND TEST EQUIPMENT REQUIREMENTS- continued
- Table C-1 TOOL AND TEST EQUIPMENT REQUIREMENTS- continued
- Table C-1 TOOL AND TEST EQUIPMENT REQUIREMENTS- continued
- Table C-1 TOOL AND TEST EQUIPMENT REQUIREMENTS- continued
- Table C-1 TOOL AND TEST EQUIPMENT REQUIREMENTS- continued
- Table C-1 TOOL AND TEST EQUIPMENT REQUIREMENTS- continued
- BLANK PAGE
- TM-11-5895-833-12
- DISTRIBUTION
- RECOMMENDED CHANGES TO EQUIPMENT TECHNICAL PUBLICATIONS
|