|
|
TM 11-5895-833-12/NAVELEX 0967-LP-550-1010/TO 31R5-2TSC54-91
SECTIN II. MAINTENANCE ALLOCATION CHART
(1)
(2)
(3)
(4)
(5)
GROUP
FUNCTIONAL GROUP
MAINTENANCE FUNCTIONS
TOLS AND
REMARKS
NUMBER
COMPONENT ASSEMBLY
EQUIPMENT
00
Frequency Conversion Subsystem
0
Daily and monthly
for Satellite Communication
0.5
inspections
Terminal AN/TSC-54
0
32
Cleaning
0.4
0
Operational checkout
0.1
0
32
Replacement of fuses and
0.2
indicator lamps
F
2,3,4,5,7,8,9,
Performance tests
2.0
10,11,12,21,
See note
32 thru 36,
119
F
30 thru 35,
See note. Replacement of
1.0
120
defective subassemblies,
cables, and connectors.
01
Cabinet Assembly
0
Daily and monthly
Down Converter (Unit 1)
0.4
inspections
0
32
Cleaning
0.4
0
Operational Checkout
0.5
0
32
Replacement of Fuses
0.2
0110
Blower Assembly (1A10)
0
Monthly inspection
(Fan Assembly, Tubeaxial)
0.1
0
32
Cleaning
0.1
F
32,33
See note. Replacement of
0.7
motor and air flow switch
011001
Wiring Harness, Ac Power (1A10W2)
F
F
30,32,33
0.1
0.5
Change 1 C-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |