|
|
TM 11-5895-833-12/NAVELEX 0967-LP-550-1010/TO 31R5-2TSC54-91
Table3-10. Unit2, Cabinet
Interconnections and Test Points - Continued
Connector
Function
A13J11
70-MHz input to up-converter 2A3J6 70 MHZ IF INPUT.
A13J12
70-MHz input to up-converter 2A2J6 70 MHZ IF INPUT.
A13J13
700-MHz input to up-converter 2A4J4-CP5 700-MHZ IF INPUT*
A13J14
700-MHz input to up-converter 2A3J4-CP5 700-MHZ IF INPUT'
A13J15
700-MHz input to up-converter 2A2J4-CP5 700-MHZ IF INPUT'
A13J16
5-MHz output to test translator 1A5J3 via time base patch panel 2A5J15.
A13J17
5-MHz from test translator standard 1A5J6 to time base patch panel A5J16.
A13J18
1-MHz spare outputs.
A13Jl9
1-MHz spare outputs.
A13J20
5-MHz spare outputs.
A13J21
5-MHz spare outputs.
*The 700-MHz input is a test input on the up-converter and an operational input on the up-converter (wide-band if.).
Section II. PRELIMINARY ADJUSTMENT OF EQUIPMENT
i. Set
each
frequency
synthesizer
METER
3-4. Preliminary Checks
FUNCTION switch to each position in turn and observe
a. Visually inspect all ground wires for defective
that the voltage meter indicates in the green area.
connections and strained conductors. Tighten any loose
connections.
NOTE
b. Check to see that all plug-in items are firmly seated
A frequency synthesizer requires a 1-hour
in their mating connectors.
warmup period to achieve maximum
c. Check to see that all cables are accurately attached
stability.
to their mating connectors and terminals.
j. Set test translator POWER
ON-OFF
circuit
breaker to ON. The POWER ON indicator lamp should
illuminate. Observe also that 725 MHz or 200 MHz
3-5. Preliminary Starting Procedure
indicator lamp illuminates.
a. Set down-converter (fig. 3-2) POWER ON-OFF
k. Set test translator LO SEL switch to 725 MHz and
circuit breakers to OFF.
observe that the 725 MHz indicator lamp illuminates.
b. Connect jumper cables on all frequency synthe-
l. Set test translator 70 MHz ON and 5 MHz ON
sizers (fig. 3-3, sheet 1) between REFERENCE FRE-
switches to on (up) position.
QUENCY SYNTH IN connector J2 and EXT STD OUT
m. Set test translator STATUS SELECT switch to each
connector J3.
position and observe the following indications on the
c. Set frequency synthesizer, test translator (fig. 3-4),
STATUS meter:
distribution amplifier (fig. 3-5), and up-converter (fig. 3-1)
Position
Indication
POWER ON-OFF toggle switches to OFF.
+ 24V
Blue scale
d. Apply power to cabinet blower assemblies (fig. 3-6).
725 MHz LO
Blue scale
NOTE
200 MHz LO
O
The BLOWER FAILURE indicator lamps on
725 MHz CONV INP
Blue scale
each cabinet blower assembly should illumi-
200 MHz CONV INP
Varies (ow)
nate and remain on for approximately 5
STD LVL
Blue scale
seconds. The indicator lamps should ex-
5 MHz INTL STD
Blue scale
tinguish when proper airflow is achieved.
70 MHz INTL STD
Blue scale
(must be 50 ohms terminated)
e. Set distribution amplifier POWER ON-OFF circuit
n. Set test translator LO SEL switch to 200 MHz;
breaker to ON. The POWER ON indicator lamp should
observe that the 725 MHz indicator lamp extinguishes
illuminate.
and the 200 MHz indicator lamp illuminates.
f interconnect the jacks on the time base patch panel
o. Set test translator STATUS SELECT switch to each
as shown in figure 3-8.
position and observe the following indications on the
g. Set distribution amplifier STATUS SELECT switch
STATUS meter.
to each position in turn, and observe that the STATUS
Position
Indication
INDICATOR meter reads in the blue scale.
+ 24V
Blue scale
h. Set each frequency synthesizer POWER ON-OFF
725 MHz LO
O
switch to ON. The POWER indicator lamp should
200 MHz LO
Blue scale
illuminate.
725 MHz CONV INP
Varies (high)
200 MHz CONV INP
Blue scale
3-14
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |