Click here to make tpub.com your Home Page

Page Title: Section III MAINTENANCE PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-4240-302-30&P-3
Section III MAINTENANCE PROCEDURES
2-7. PROTECTIVE ENTRANCE CONTROL MODULE.
This task covers the removal, 'disassembly, repair, reassembly and installation of the following:
a. Housing/panel (p. 2-33)
f.
Dome light DS2 (p. 2-38)
b. Toggle switch S3 (p. 2-34)
g.
Switching card A3 (p. 2-39)
c. LOW PRESSURE switch/indicator light
h.
Power card Al (p. 2-40)
DS4/S5 (p. 2-35)
i.
Pressure transducer MT1 (p. 2-41)
d. PURGE indicator light DS3 (p. 2-36)
j.
Female hose adapter (p. 2-42)
e. Interval TIMER switch S4 (p. 2-37)
k.
Male hose adapter (p. 2-43)
I.
Wiring (p. 2-44, 2-45)
INITIAL SETUP
Tools
Troubleshooting References
Electronic Equipment Tool Kit
Refer to page 2-2
TK-105/G
Equipment Condition
References
PECM removed from the protective entrance
TB SIG 222
LOCATION
ITEM
ACTION
DISASSEMBLY
Protective Entrance
Housing/panel
1. Remove twelve screws (1) from panel (2).
Control Module
2. Carefully pull panel (2) away from housing (3).
REPAIR
Gasket
Replace gasket (4) if defective.
REASSEMBLYI
1. Place panel (2) on housing (3), and secure with
twelve screws (1).
2-33

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business