|
|
![]() TM 3-4240-302-30&P-3
2-7. PROTECTIVE ENTRANCE CONTROL MODULE (CONT).
LOCATION
ITEM
ACTION
REMOVAL
Panel
Toggle switch S3
1. Disassemble PECM (p. 2-33).
2. Remove three screws (1) and wires (2) from
toggle switch S3 (3). Tag wires.
3. Remove nut (4) and washer (5).
4. Remove toggle switch S3 (3) and keying
washer (6).
INSTALLATION
1. Install keying washer (6) on toggle switch
S3 (3).
2. Insert toggle switch S3 in panel and secure
with washer (5) and nut (4).
3. Attach wires (2) to toggle switch S3 using
three screws (1). Refer to wiring diagram
4. Reassemble PECM (p. 2-33).
2-34
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |