m. When the pressure tank is charged, close the
er.) Screw the pressure cylinder test gage assembly (5,
pressure tank valve (7, fig. 6), open the bleeder valve (6,
h. Open the pressure tank valve (6).
i. Close the filling line valves (1).
hose (4, fig. 9) and pressure cylinder gage (5) from the
j. Open the cylinder valves (2).
tank. Screw the cap on 'the check valve (7, fig. 8) and
wrenchtighten.
k. Read the pressure gages to determine which
n. When all pressure tanks have been charged,
cylinder has the lower pressure. Open the filling line
follow directions in paragraph 7i.
valve (1) at the gage showing the lower pressure.
I. Observe the pressure cylinder test gage until the
9. Testing Pressure in Pressure Tank
a. Unscrew the cap from the check valve (7, fig. 8).
needle stops rising or reaches at least 1,700 psi. When
the gage reaches the desired pressure, turn off the filling
b. Moisten the end of the check valve with water or
line valves (1). II necessary, continue using cylinders
saliva.
with higher pressure (para 7h(2)) to reach 1,700 psi.
c. Screw the pressure cylinder test gage (5, fig. 9)
When the highest pressure shown on the filling line gage
on the check valve (7, fig. 8).
is less than 1,700 psi, close both cylinder valves and
d. Read the gage (1) to determine the pres- sure in
bleed the pressure from the rubber hose. Close all filling
the pressure tank.
line valves and re- move the cylinder having the lowest
e. Unscrew the gage and replace the check valve
pressure. Replace it with a fully charged cylinder. With
cap.
chalk, mark the lowest pressure on the removed cylinder.
Section II. AIR-CHARGING ABC-M9-7 or M9A1-7 FLAMETHROWER
(4) Connect the quick-coupling adapter as- sembly
10. Using AN-M4 Compressor
(12, fig. 3) to the male coupling half on the high-pressure
Charge the ABC-M9-7 or M9-A1-7 high-pressure
sphere valve (2, fig. 10).
spheres as follows:
(5) Close the bleeder valve (6, fig. 8).
a. Attaching Charging Hose Assembly (18, fig. 2) to
c. Charging.
Compressor. Follow directions given in paragraph 5a.
(1) Open the globe valve (6, fig. 6) on the separator
b. Attaching Hose Assembly to High-Pressure
of the compressor.
Sphere.
(2) Start the engine.
(1) Close the high-pressure sphere valve (2, fig. 10).
(2) Disconnect the pressure hose (1) from the plug
NOTE
on the high-pressure sphere valve.
(3) Screw the quick-coupling adapter assembly (12,
There are four models of the AN-M4
compressor.
Refer to applicable
foot rubber hose (36, fig. 2).
technical manual (appendix) for the
type of compressor being used.
WARNING
See that the locking collar on the
(3) Close the globe valve.
quick-disconnect coupling half is
fully retracted and resting against the
WARNING
first wrenching surface. Do not push
Operating personnel must always
locking collar forward since this will
position themselves away from the
release the coupling half from the
charging hose assembly during
charging fitting.
charging operations. If either the
charging hose or connector fail, the
remaining portion of the charging
hose will "whip around" and may
injure personnel in its path.
(4) Open the high-pressure sphere valve (2, fig. 10).
15
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |