Click here to make tpub.com your Home Page

Page Title: After-Charging Procedure.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

1
Pressure hose
2
High-pressure sphere valve
3 High-pressure sphere
Figure 10. M9 tank group.
(5) During charging, check the pressure gage to
NOTE
make sure that the pressure is increasing at a uniform
There are four models of the AN-M4
rate.
Refer to applicable
(6) When the high-pressure sphere has been
technical manual (appendix) for the
charged to a pressure of 2,000 psi, close the high-
type of compressor being used.
pressure sphere valve.
WARNING
(8) Stop the engine.
Open globe valve with caution. The
d. After-Charging Procedure.
oil, water, and air emulsion released
(1) Open the bleeder valve (6, fig. 8) on the 6-foot
under pressure can cause injury to
rubber hose one-fourth turn.
personnel.
(2) Remove the charging line from the plug on the
(7) Open the globe valve (6, fig. 6) one- half turn.
high-pressure sphere valve (2, fig.
16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business