Click here to make tpub.com your Home Page

Page Title: Table 4-1. Preventive-Maintenance Checks and Services-Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-1040-214-12
Table 4-1. Preventive-Maintenance Checks and Services-Continued
Organizational Maintenance Category
Monthly Schedule
Sequence
Paragraph
No
Item to be inspected
Procedure
reference
4
Barrel section --------------------------------
Inspect the barrel section for damage. Inspect locknut
and threads for damage. Inspect collar and setscrews
for damage and missing parts. Replace parts as
authorized.
HOSE GROUP
5
Hose assembly ------------------------------
a. Check painting and stenciling of hose --------------------------
b . Check hose assembly for cuts, kinks, and deteriora-
tion.
6
Hose fitting, quick-disconnect coupling
Check hose fitting threads for damage. Perform opera-
half, and gasket.
tion of quick-disconnect coupling half. Check coupling
ring and retaining balls. Check inner preformed pack-
ing for damage and deterioration. Replace parts as
authorized.
TANK GROUP-PRESSURE SECTION
7
Pressure tank and valve assembly -----
Inspect for damage ------------------------------------------------------
Inspect dust caps and chains for missing parts and
damage. Replace parts as authorized.
Check test dates ------------------------------------------------------
8
Valve shaft assembly and handle -------
Secure pressure tank and operate valve handle to check
operation of valve shaft and valve assembly. Operate
valve handle clockwise and counterclockwise several
times. Replace parts as authorized.
9
Pressure regulator --------------------------
Adjust pressure regulator-----------------------------------------------
10
Pressure regulator and safety valve ----
Inspect pressure regulator and safety valve for damage.
Replace parts as authorized.
11
Safety valve, washer, and safety head
Check to see that safety head is not painted. Inspect
safety head and washer for damage. Replace parts as
authorized.
12
Pressure tank --------------------------------
Check test dates. Pressurize tank when required after
pressure test.
13
Hose assemblies ----------------------------
Inspect hose assemblies for cuts and deterioration.
Operate quick-disconnect coupling half and check for
damage to attaching parts. Replace parts as au-
thorized.
14
Shutoff valve, handle, and vent tube ---
Operate shutoff valve handle to check operation of
shutoff valve. Check for missing vent tube. Open end
should be free of foreign material.
15
Pressure regulator tube and quick-dis
Inspect for dents, cracks, and other damage. Operate
connect coupling half.
and inspect quick-disconnect coupling half for damage.
16
Preformed packing and setscrews -----
Inspect screws for damaged threads. Inspect preformed
packing for damage.
TANK GROUP-AGENT SECTION
17
Pipe and cap assembly--------------------
Inspect pipe and cap assemblies, including attaching
parts, for damage. Inspect preformed packing for
deterioration. Inspect cap threads for excessive wear.
Replace parts as authorized.
18
Agent tank-------------------------------------
Check test dates ----------------------------------------------------------
TANK GROUP-CARRIER SECTION
19
Carrier pack ----------------------------------
Inspect frame for damage. Check for loose and missing
cotton cord and hardware. Inspect carrier pack,
shoulder straps, cotton cord, and attaching parts for
cuts and tears and mildew. Replace parts as au-
thorized.
4-15

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business