|
|
TM 11-405-10
CHAPTER 5
SHIPMENT AND LIMITED STORAGE AND DEMOLITION TO PREVENT ENEMY USE
Section I. SHIPMENT A
e. Remove the enlarger body from the girder
37. Disassembly of Processing Set
assembly.
Disassemble the processing set for packaging as
follows:
f. Remove the girder assembly from the basebard.
a. Disconnect all power cord connections.
g. Place the components in their
respective
b. Disconnect the safelight.
c. Clean all components (par.
38.
Repackaging Processing Set for Shipment or
readiness for packaging.
Limited Storage
d. Remove the condenser lens assembly from the
Repackaging of the processing set is covered in TM 11-
enlarger body.
405-25.
Section II. DEMOLITION OF MATERIEL TO PREVENT ENEMY USE
(1) Smash. Smash the lenses, timers, and all
39. Authority for Demolition
metal components; use sledges, axes,
Demolition of the equipment will be accomplished only
handaxes,
pickaxes,
or
upon the order of the commander. Use the destruction
crowbars.
procedures outlined in paragraph 40 to prevent further
(2) Cut. Cut all cords, cables, and wiring; use
use of the equipment.
axes, handaxes, or machetes.
40. Methods of Destruction
(3) Burn. Burn cords, cables, manuals, and
a. If complete destruction of the equipment cannot
film; use gasoline, kerosene, oil, flame
be accomplished in the time available, destroy the
throwers, or incendiary grenades.
following components in the order given
(1) Condenser lens assemblies.
firearms, grenades, or TNT.
(2) Projection lenses.
(5) Dispose. Bury or scatter the destroyed
(3) Enlarger.
parts in slit trenches, foxholes, or other
(4) Remaining components of the processing
holes, or throw them into streams.
set.
b. Use any of the following methods:
AGO 5894A
50
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |