|
|
TM 5-4930-233-14
TM 4930-14/1
LUBE TANK ASSEMBLY
4-38. LUBE TANK - REPLACE/REPAIR
This task covers:
a. Removal
b. Disassembly
c. Repair
d. Assembly
e. Installation
INITIAL SET-UP:
Personnel Required
Materials/Parts
2
Dry cleaning Solvent
(Item 6, AppE)
Silicon Sealant (Item 14, App E)
Equipment Condition
Enclosure removed (para 4-11)
Tools
Alcohol Injector Removed (para 4-35)
General Mechanics Tool Box
Three air regulators removed (para 4-36)
(Section III, Item 1, App B)
Low and high pressure pumps removed
a. Removal
NOTE
GAA Grease will have to be scooped out.
(1)
Completely drain all lubricants from lube tank (1) by removing three plugs (2).
4-109
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |