|
|
TM 3-1040-279-12&P
ORGANIZATIONAL PREVENTIVE MAINTENANCE
CHECKS AND SERVICES QUARTERLY SCHEDULE (CONT)
ITEM TO BE INSPECTED
PROCEDURES
ITEM NO.
b. Remove end of fog oil pump supply hose (1) to
M157 Smoke Generator Set (cont)
7 (cont)
pressure relief valve and place in a container of
light 10W grade lubricating oil (NSN 9150-00-189-
6727).
c. Remove fog oil hose end (2) from fog oil strainer
(3) and place in same container of 10W grade
lubricating oil.
NOTE
M1059 Vehicle-Curbside M54 Smoke
Generator has to be removed from mount to
gain access to panel.
d. Remove the right side panel (Para 4-16c) for the
M54 Smoke Generator equipment container which
matches to the fog oil pump being flushed with
lubricating oil. Place fog oil By-pass switch in the
ON (up) position.
e. Power-up the Control-Indicator Panel and place
the FOG OIL switch in the ON (middle) position.
Run the fog oil pump for a minimum of two minutes
to flush moisture out.
f. Place Fog Oil switch in the OFF (down) position.
Turn-off Control-Indicator Panel power.
g. Place fog oil By-pass switch in the OFF (down)
position. Install right side panel on M54 Smoke
Generator equipment container (Para 4-16c).
h. Connect end of fog oil pump supply hose (1) to
pressure relief valve and connect fog oil hose end
(2) to fog oil strainer (3).
4-4.2
Change 4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |