Click here to make tpub.com your Home Page

Page Title: Figure 2-8. Carrier section.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Figure 2-8. Carrier section.
(5) Disconnect and remove all strap assemblies
(2) Connect the adapter (7, fig.  2-6) to the
from the frame (10, fig. 2-8).
diffusion tube nut (6).
(6) Remove the attaching hardware to remove
(3) Cross both hose assemblies (5) and connect
the frame (10) from the agent tanks.
the quick-disconnect coupling half (3) that is on each
hose to the pipe and cap assembly (4).
b. Assembly.
(4) Install the pressure tank and valve assembly.
Refer to TM 3-1040-214-12.
(1) Connect the agent tanks to the frame with the
hardware removed in a(16) above.
2-9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business