TM 5-3610-254-14
4-6. INSTALLATION INSTRUCTIONS
The Editorial Shelter is installed for operation either on the bed of a 2-1/2 ton 6 X 6 cargo truck or on the ground. The
individual items of equipment in the Editorial Shelter are usually transported intact in their operating position and no
installation procedures are deemed necessary. Refer to the following paragraphs for things to do when installing the
shelter:
Paragraph
a.
Site Preparation
b.
Unloading Shelter
c.
Grounding Editorial Shelter
d.
Setting Up Generator and Connecting Main
Power Cable
e.
Setting Up Equipment
f.
Lubrication
g.
PMCS 2-13
h.
Fill Water Tank
Required if shelter is to be emplaced on the ground.
4-7. SITE PREPARATION
a. Select a site where ground is firm, dry, and has good drainage.
b. Level ground on which shelter will be placed.
c. Place enough concrete blocks or wooden beams on level spot to support shelter adequately.