|
|
TM 5-3610-254-14
4-11. SETTING UP EQUIPMENT
Plug the power cords of the individual items of equipment into the wall receptacles provided near their operating
positions. Specialized preoperating instructions for individual items of equipment, where necessary, will be found in the
respective commercial equipment manuals provided with the shelter. Set all circuit breakers in main power service box
to on.
4-12. MOVING TO NEW WORKSITE
PREPARATION FOR MOVEMENT
a. Secure all expendable materials and supplies. Stow all loose supplies.
b. Secure telephone in telephone bracket with shipping clamp.
c. Secure red shipping bracket to top of light table.
d. Be sure lock bar is installed in historical file cabinet.
e. Secure folding artist shelves in upright position with red shipping brackets.
f. Close and secure wall cabinet and artist supply cabinet doors.
g. Secure stools under light table shelves with straps.
h. Prepare camera for shipping by doing the following:
(1) Remove lenses and stow in supply storage cabinet drawer.
(2) Install red holddown bars on copyboard.
(3) Move lenseboard up with bellows compressed.
(4) Close and secure top of camera.
i. Secure cover on PMT processor with red thumbscrews. Secure base of processor to shelf with red thumbscrews.
4-7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |