|
|
TM 5-3835-222-BD
Splice cable with two clamps. The end of the cable should extend at least 1/2 inch beyond
(2)
the clamp as shown.
Swage the sleeves on the cables with
(3) Splice the cable with two nicropress sleeves.
installation tool, a vise, or a hammer.
c. Adjust cable to its proper tension.
d. Record the BDAR action taken. When the mission is completed, as soon as practicable, repair
the equipment using standard maintenance procedures.
devices, cotter keys, lacing wire or safety pins to keep the connecting bolts or pins in place. During
BDAR repairs, small pins may become lost or forgotten which will cause linkage or component failure.
Repairing the equipment by securing connecting bolts or pins can be accomplished using wire,
welding rod, bolts or nails. Place the item through the hole and bend the ends to keep it from
falling out. Castelated nuts can also be retained using this method. Alignment pins or dowels can
be replaced with cut bolts. Use a bolt that is a tight fit in the hole, tap the bolt in and cut to
proper length.
3-12
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |