TM 32-5865-069-24&P
GENERAL SUPPORT MAINTENANCE INSTRUCTIONS
5-1. SCOPE. This chapter provides the information required for general support
maintenance personnel to perform the maintenance tasks authorized in the Mainte-
nance Allocation Chart (MAC). Maintenance is performed using Electronic Equipment
Test Station AN/USM-410 for those items listed in table 5-1. Manual testing
procedures are provided for those modules not tested on the AN/USM-410. These
modules will be evacuated to SIG/INT EW section for diagnostic testing and repair.
AN/USM-410. The levels are defined as follows:
a. Level 1.
Go-chain (performance) test at unit level. No disassembly is
required.
b. Level 2. Unit level diagnostic tests necessary to isolate faults to a
printed circuit assembly/module; or a function group of printed circuit
assemblies/modules. Minimal disassembly is required for testing.
Go-chain (performance) tests at printed circuit assembly/module
Level 3.
level.
d. Level 4. Printed circuit assembly/module level diagnostic tests necessary
to fault isolate to the active piece part/functional group.
AN/USM-41O. The required items of test equipment for each UUT are identified in
Test Equipment Software Programs (ATESP) written for the UUTS specified are stored
on Test Program Tape (TPT) and are identified by a specific TPT number. TPT
number, program entry points and file names are listed in table 5-1. Operation of
the AN/USM-410 is described in technical manual PDEP 11-6625-2773-12-3. The test
procedure for each UUT is as follows:
a. Pre-test inspection:
(1) Inspect the UUT as described in table 5-2.
(2) Correct any defects found before beginning testing.
b. Preprogram start procedure:
(1) Perform the turn-on procedure for the AN/USM-410 as described in PDEP
11-6625-2773-12-3.
(2) Mount the ATESP magnetic tape in accordance with the instructions
detailed in PDEP 11-6625-2773-12-3.
|