Click here to make tpub.com your Home Page

Page Title: CHAPTER 5 GENERAL SUPPORT MAINTENANCE INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 32-5865-069-24&P
GENERAL SUPPORT MAINTENANCE INSTRUCTIONS
5-1.  SCOPE. This chapter provides the information required for general support
maintenance personnel to perform the maintenance tasks authorized in the Mainte-
nance Allocation Chart (MAC).  Maintenance is performed using Electronic Equipment
Test Station AN/USM-410 for those items listed in table 5-1. Manual testing
procedures are provided for those modules not tested on the AN/USM-410. These
modules will be evacuated to SIG/INT EW section for diagnostic testing and repair.
5-2. TEST LEVEL DESCRIPTIONS. Four levels of test can be performed using the
AN/USM-410. The levels are defined as follows:
a.  Level 1.
Go-chain (performance) test at unit level. No disassembly is
required.
b.  Level 2.  Unit level diagnostic tests necessary to isolate faults to a
printed circuit assembly/module; or a function group of printed circuit
assemblies/modules.  Minimal disassembly is required for testing.
Go-chain (performance) tests at printed circuit assembly/module
Level 3.
level.
d.  Level 4.  Printed circuit assembly/module level diagnostic tests necessary
to fault isolate to the active piece part/functional group.
5-3. TEST PROCEDURES. Tests for each Unit Under Test (UUT) specified in
table 5-1 require Interface Devices (ID) and cables to connect the UUT to the
AN/USM-41O.  The required items of test equipment for each UUT are identified in
table 5-1.  Interconnection data is shown in the referenced figure. Automatic
Test Equipment Software Programs (ATESP) written for the UUTS specified are stored
on Test Program Tape (TPT) and are identified by a specific TPT number. TPT
number, program entry points and file names are listed in table 5-1. Operation of
the AN/USM-410 is described in technical manual PDEP 11-6625-2773-12-3. The test
procedure for each UUT is as follows:
a. Pre-test inspection:
(1) Inspect the UUT as described in table 5-2.
(2) Correct any defects found before beginning testing.
b. Preprogram start procedure:
(1) Perform the turn-on procedure for the AN/USM-410 as described in PDEP
11-6625-2773-12-3.
(2) Mount the ATESP magnetic tape in accordance with the instructions
detailed in PDEP 11-6625-2773-12-3.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business