TM 32-5410-221-14&P
(1) Remove damaged or excessively worn
d. Pull firmly on other edge of circuit breaker until
floor mat.
other clip releases.
CAUTION
e. Remove circuit breaker.
f. Position new circuit breaker and press firmly on
Ensure that cleaner does not get into
left or right edge until clip engages.
the floor panel of the S-280( )/G. It
g. Press firmly on other edge of circuit breaker
will dissolve the styrene core
until other clip engages.
material.
h. Reinstall power distribution box cover.
i. Set Main Power Switch to ON.
(2) Clean adhesive from floor using netone
j. Test new circuit breaker operation.
methylethyl cleaner, item 3, Appendix F.
(3) Apply zinc chromate primer, item 20,
5-12
Appendix F, to floor.
(4) Apply lusterless gray enamel, item 8,
WARNING
(5) Cut new floor mat to size using matting,
Dangerous voltage is present in the
item 13, Appendix F.
electrical circuits. Death on contact
NOTE
may result.
Use all safety
Do not use adhesive when installing
precautions and be extremely careful
new floor mat.
when
performing
electrical
troubleshooting and repairs.
(6) Lay new floor mat in place.
a. Removal.
(1) Set LIGHTS circuit breaker to OFF.
Provide other lighting as required.
(1) Remove two screws (1), flat washers (2),
and lockwashers (3) from lamp fixture.
(2) Remove limit switch cover by removing
four screws.
(2) Remove window glass (13 or 14) from
lamp fixture.
(3) Tag and disconnect lead wires.
(3) Replace defective bulb(s).
(4) Detach limit switch from shelter wall by
removing three screws (2).
(4) Reinstall window glass (13 or 14) on lamp
fixture.
(5) Disconnect conduit fitting from limit switch
housing.
(5) Secure, using two screws (1), flat washers
(2), and lockwashers (3).
(6) Remove limit switch.
5-11
POWER DISTRIBUTION BOX CIRCUIT
b. Installation.
secured to the box assembly by retaining clips at the
(1) Feed lead wires through limit switch wiring
rear of the circuit breakers. To replace a circuit breaker,
hole into limit switch housing.
proceed as follows:
(2) Connect conduit fitting to limit switch.
WARNING
(3) Attach limit switch to shelter wall using
three screws (2).
Dangerous voltage is present in the
electrical circuits. Death on contact
(4) Connect lead wires.
may result.
Use all safety
(5) Install limit switch cover using four
precautions and be extremely careful
screws.
when
performing
electrical
(6) Set LIGHTS circuit breaker to ON.
troubleshooting and repairs.
(7) Test new limit switch.
a. Set Main Power Switch to OFF. Provide other
5-13
lighting as required.
is secured to the shelter ceiling by three screws (2).
b. Remove power distribution box cover.
Remove the screws to replace the hasp.
c. Pull firmly on left or right edge of circuit breaker
until clip releases.
5-9
|