Click here to make tpub.com your Home Page

Page Title: Table 5-1. Organizational Preventive Maintenance Checks and Services - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 32-5410-221-14&P
Table 5-1. Organizational Preventive Maintenance Checks and Services - Continued
W - Weekly
Q - Quarterly
A - Annually
H - Hours
M - Monthly
S - Semiannually
B - Biennially
MI Miles
ITEM
INTERVAL
Item to be
Procedures
Equipment will be reported
NO
WM
QSAB
H MI
inspected
Not Ready (Red) if:
8
EXTERIOR
WARNING
POWER CABLES,
Disconnect power before per-
AND EARTH
forming step 8.
GROUND CON-
NECTION
Check for loose connections. Tighten as
necessary.
Inspect insulation, wires and terminals for
Damage renders shelter
damage such as cuts, abrasions, frays, breaks,
inoperative or causes safety
kinks and bends. Repair damage or replace
hazard.
parts as necessarily.
9
SHELTER
Inspect overall exterior for damage such as
Damage renders shelter
EXTERIOR
holes, open seam is, cracks, and punctures.
inoperative and is not
Repair damage.
repaired.
10
SHELTER DOOR
Check for fit and proper operation of hinges
Door is inoperative and
and Iatch. Repair or replace as necessary.
damage is not corrected.
11
SHELTER
Check for signs of seepage or leaks. Repair
Seepage or leaks render
INTERIOR
as necessary.
shelter inoperative, and
damage is not corrected.
5-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business