Click here to make tpub.com your Home Page

Page Title: Table 5-1. Organizational Preventive Maintenance Checks and Services - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 32-5410-221-14&P
Table 5-1. Organizational Preventive Maintenance Checks and Services - Continued
W - Weekly
Q - Quarterly
A - Annually
H - Hours
M - Monthly
S - Semiannually
B - Biennially
MI Miles
ITEM
INTERVAL
Item to be
Procedures
Equipment will be reported
NO
WM
QSAB
H MI
inspected
Not Ready (Red) if:
5
MODIFICATIONS
Verily application of all current MWO's.
Urgent MWO(s) are not
Apply urgent MWO's immediately. When
applied.
possible, schedule normal MWO's to avoid
disrupting operations.
*6a
PRESERVATION
Clean shelter by removing all accumulated
soil such as dust, dirt, grease, and grit.
Inspect all painted surfaces for damage such
Paint damage is beyond touch
as cracked, chipped naked, peeled, weathered,
up.
and worn paint. Refinish as necessary.
Inspect all surfaces for deterioration such as
Surface damage is severe.
rust, corrosion, and fungi.
*7b
INSTALLATION
Check shelter and its support for stability.
Shelter or support cannot be
AND SUPPORT
Reposition, realign, or resupport shelter
stabilized.
As necessary.
Check shelter support fittings for loose
connections. Tighten as necessary.
a. Preservation procedures may be required more frequently when the shelter is operated under unusual conditions.
b. Installation and support procedures may be required more frequently when the shelter is not installed on a solid and level base.
5-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business