Click here to make tpub.com your Home Page

Page Title: Section III. OPERATION UNDER UNUSUAL CONDITIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 32-5410-221-14&P
CAUTION
(2) Disconnect power cord from receptacle
for an extended shutdown period.
When
emergency
stopping
(3) Close intake grille damper.
procedure is used, set all circuit
(4) Attach exterior rain cover.
breakers  and  equipment  power
switches to OFF before restarting the
NOTE
equipment.
This  will  prevent
overloading the power source during
Refer  to  TM
5-4120-222-14  for
initial current drain.
detailed air conditioner operating
instructions.
To turn the equipment off in an emergency, set the
MAIN POWER SWITCH to OFF
3-5
EMERGENCY STOPPING PROCEDURE.
.
Section III. OPERATION UNDER UNUSUAL CONDITIONS
3-6
SCOPE.  The S-281/G is fully insulated and
c. In hot, dry climates, connectors, receptacles and
weatherproofed for operation in hot, cold, or moderate
binding posts are subject to dust and dirt damage.
climates. It provides protection from the elements for
Close entrance box and receptacle covers when not in
personnel and equipment.  However, under extreme
use.
conditions, the following precautions are necessary:
d. In warm, damp climates, equipment is subject to
moisture and fungus damage.  Wipe moisture and
fungus from equipment with a lint-free cloth.
a. Extreme cold causes cables and wires to
become hard, brittle, and difficult to handle. Be careful
handling and connecting cables to avoid kinks, loops,
and stress that may result in permanent damage.
b. Be sure that entrance box binding post and
connectors are free from frost, snow, and ice. Close
entrance box and receptacle covers when not in use.
Keep open connectors out of water, snow, and ice to
keep them dry.
Section IV. PREPARATION FOR MOVEMENT
3-7
SCOPE.
Preparation of the S-28 1/G for
(a) Central or Commercial Power. Set
movement is limited to disconnecting equipment and
main power source circuit breaker to OFF.
securing it as follows:
(b) Individual Generator Power.  Stop
a. Cleaning. Clean interior and exterior of shelter.
(3) Disconnect power cable at source.
(4) Unplug power cable from shelter power
b. Air Conditioner.
entrance box.
(1) Turn SELECTOR SWITCH to OFF.
(5) Roll power cable onto cable reel.
(2) Disconnect and secure air conditioner
(6) Secure cable reel in tiedown position.
power cable in tiedown position.
d. Grounding Assembly.
(3) Close intake grille damper.
(1) Disconnect ground strap from shelter
(4) Attach exterior rain cover.
ground lug and ground rod.
(5) Refer  to  the  applicable  manual  for
(2) Clean and secure ground strap in tiedown
additional requirements for individual models.
position.
c. Electrical Power Cable.
(3) Remove ground rod from ground.
(1) Set  all  shelter  circuit  breakers  and
(4) Clean and secure ground rod in tiedown
electrical equipment switches to OFF.
position.
(2) Power:
3-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business