|
|
TM 32-5410-221-14&P
CAUTION
(2) Disconnect power cord from receptacle
for an extended shutdown period.
When
emergency
stopping
(3) Close intake grille damper.
procedure is used, set all circuit
(4) Attach exterior rain cover.
breakers and equipment power
switches to OFF before restarting the
NOTE
equipment.
This will prevent
overloading the power source during
Refer to TM
5-4120-222-14 for
initial current drain.
detailed air conditioner operating
instructions.
To turn the equipment off in an emergency, set the
MAIN POWER SWITCH to OFF
3-5
EMERGENCY STOPPING PROCEDURE.
.
Section III. OPERATION UNDER UNUSUAL CONDITIONS
3-6
SCOPE. The S-281/G is fully insulated and
weatherproofed for operation in hot, cold, or moderate
binding posts are subject to dust and dirt damage.
climates. It provides protection from the elements for
Close entrance box and receptacle covers when not in
personnel and equipment. However, under extreme
use.
conditions, the following precautions are necessary:
d. In warm, damp climates, equipment is subject to
moisture and fungus damage. Wipe moisture and
fungus from equipment with a lint-free cloth.
a. Extreme cold causes cables and wires to
become hard, brittle, and difficult to handle. Be careful
handling and connecting cables to avoid kinks, loops,
and stress that may result in permanent damage.
b. Be sure that entrance box binding post and
connectors are free from frost, snow, and ice. Close
entrance box and receptacle covers when not in use.
Keep open connectors out of water, snow, and ice to
keep them dry.
Section IV. PREPARATION FOR MOVEMENT
3-7
SCOPE.
Preparation of the S-28 1/G for
(a) Central or Commercial Power. Set
movement is limited to disconnecting equipment and
main power source circuit breaker to OFF.
securing it as follows:
(b) Individual Generator Power. Stop
the generator.
a. Cleaning. Clean interior and exterior of shelter.
(3) Disconnect power cable at source.
See paragraph 5-9.
(4) Unplug power cable from shelter power
b. Air Conditioner.
entrance box.
(1) Turn SELECTOR SWITCH to OFF.
(5) Roll power cable onto cable reel.
(2) Disconnect and secure air conditioner
(6) Secure cable reel in tiedown position.
power cable in tiedown position.
d. Grounding Assembly.
(3) Close intake grille damper.
(1) Disconnect ground strap from shelter
(4) Attach exterior rain cover.
ground lug and ground rod.
(5) Refer to the applicable manual for
(2) Clean and secure ground strap in tiedown
additional requirements for individual models.
position.
c. Electrical Power Cable.
(3) Remove ground rod from ground.
(1) Set all shelter circuit breakers and
(4) Clean and secure ground rod in tiedown
electrical equipment switches to OFF.
position.
(2) Power:
3-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |