Click here to make tpub.com your Home Page

Page Title: TERMINAL BOARD.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-6665-329-13&P
This task covers:
Removal
a.
b.
Installation.
INITIAL SETUP
Tools:
Electronic equipment tool
kit TK-105/G
NOTE
The following procedures apply to replacement of the
two terminal boards on the test set.
a.
Removal
(1) Remove lid and panel assembly (para 3-11b steps 1 thru 8).
(2) If required, open CABLE STORAGE door for access to mounting hardware of TB2.
(3) Remove four screws (1), nuts (3), Iockwashers (2).
(4) Remove terminal board (4).
(5) Remove wires from terminal board (4).
b.
Installation.
(1)
Using FO-2 as a guide, install wires on terminal board (4).
Install terminal board (4) on test set using four screws (1), Iockwashers (2), and nuts (3).
(2)
If opened, close CABLE STORAGE door.
(3)
(4)
Install panel assembly and lid (para 3-11c steps 4 thru 8 and 20).
3-96

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business