Click here to make tpub.com your Home Page

Page Title: TROUBLESHOOTING PROCEDURES (CONT).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-4240-302-30&P-3
Measure voltage
between:
(+)
(-)
28 V dc positive J20-D
Turn timer slightly
to right (1/4 of way
to 5 position).
Did
purge
indicator
light?
indicate
28 2 V dc?
Remove power. Remove
screws on PECM panel
and lift up for access to
Proceed to page 2-16.
components (p 2-33).
Repair wire (4) between
S4-T1 and J20-D
(p. 2-44). Apply power.
Repeat test on this page.
Remove power.
Remove screws on
PECM panel and lift
up for access to
components
power. Measure
voltage between:
(+)
(-)
S4-T1
TB1-1
Measure voltage
Measure voltage
between:
between: (Make
Was 0 V dc
sure timer is
(+)
(-)
obtained?
running.)
S4-L1
TB1-1
(+)
(-)
DS3-2
TB1-1
Was 0 V dc
obtained?
Was 0 V dc
obtained?
Remove power. Repair
Remove power. Replace
Remove power. Repair
Remove power. Replace
wires #2, #9, and TB1
PURGE indicator light
wire (10) between DS3-2
interval TIMER switch S4
jumper from S4-L1
DS3 (p. 2-36). Apply
and S4-T1 (p. 2-44).
(p. 2-37). Apply power.
(p. 2-44). Apply power.
power. Repeat test on
Apply power. Repeat test
Repeat test on this page.
Repeat test on this page.
this page.
on this page.
2-15

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business