Click here to make tpub.com your Home Page

Page Title: TROUBLESHOOTING PROCEDURES.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-4240-302-30&P-3
2-6. TROUBLESHOOTING PROCEDURES.
NOTE
All voltages are dc and are measured
with respect to dc return (TB1-1)
unless otherwise specified.
Disassemble PECM
(p. 2-33). Repair short in
ground wire circuits [i.e.,
all wires connected to
terminal board TB1-1
and TB1-2 (p. 2-44)].
Repeat test on this page.
Repair wires #6 and #37
between J20-F and
chassis of PECM
(p. 2-44). Repeat test on
this page.
Repair wires #6 and #33
Proceed to page 2-4.
between J20-F and J21-C
(p. 2-44). Repeat test on
this page.
2-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business