|
|
TM 3-1040-279-12&P
ORGANIZATIONAL PREVENTIVE MAINTENANCE
CHECKS AND SERVICES QUARTERLY SCHEDULE (CONT)
ITEM NO.
ITEM TO BE INSPECTED
PROCEDURES
3
Ignitor
Clean and inspect.
a. Remove ignition cable (1) from igniter (2).
b. Check ignition cable for broken, missing,
or cracked insulator. If damaged or missing,
replace cable.
c. Remove ignitor (2) from pulse jet engine (3).
d. Clean spark ignitor (2) with dry cleaning
solvent (Item 4, App E) and rags (Item 11,
burned, loose or pitted center pole (7), and cut
or missing gasket (5). If damaged, replace.
e. Install igniter (2) in pulse jet engine (2).
f. Install ignition cable (1) on ignitor (2).
Fuel Pump Pressure
4
Adjust fuel pump pressure (P. 4-62).
4-4
Change 3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |