|
|
TM 3-1040-276-23
ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES SCHEDULE (CONT)
M - MONTHLY
S - SEMIANNUALLY
Item
Interval
To Be
Item
Procedures
inspected
No.
M
S
m. While holding air pump handle (14), insert plunger (16) into air pump
Magneto air
3
tube (15) and push handle and clamp until clamp mates with tube and
pump
assembly
slides onto bracket (4). Install cap screw (11) and washer (12) through
frame (13) and into clamp (5).
(cont)
NOTE
Aline teeth on rack with ignition magneto gear. Operate
handle to make sure teeth are alined.
n. Position ignition magneto assembly (6) housing onto clamp (5) and
install cap screw (3) with washer.
o. Install cap screw (7), flat washer (8), nut (9), and Iockwasher (10) into
ignition magneto assembly (6) housing and clamp (5).
p. Connect ignition cable (1) to ignition magneto assembly outlet (2).
q. Operate smoke generator (TM 3-1040-276-10).
Change 1
2-7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |