Click here to make tpub.com your Home Page

Page Title: Figure 9-3. Checkout Test Connections
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

T.O. 12P4-2APX-192
NAVAIR 16-35TS1843-1
TM 11-6625-1646-25
tested are identified throughout the checkout procedure. Refer
9-10.  REPAIR AND REPLACEMENT.  Repair consists of
to section IV for test equipment required for checkout and
removal and replacement of faulty components isolated by
section VIII for test point locations and instructions to gain
routine  troubleshooting  procedures.  No  special  repair
access to test points. Checkout the transponder set test set
instructions are required other than those used by experienced
electronics technicians. Following component removal and
replacement, replace potting compound, where required, using
General Electric RTV 118 or equivalent.  Following repair
9-14. TROUBLESHOOTING. Troubleshooting procedures are
perform checkout procedures per paragraph 9-13 to ensure
used to isolate a fault to a replaceable component. Checkout
the transponder set test set is operating properly.
procedures may be used as an aid to isolate a fault to a circuit.
Refer to section V for theory of operation data to determine
circuit dependencies when troubleshooting using checkout
9-11. ASSEMBLY. Assembly of the transponder set test set
procedure results.  Refer to section IV for test equipment
is the reverse of disassembly procedures.
required for troubleshooting.
Refer to section VIII for
component locations on modules A2 through A4. See figures
9-12. TESTING.
9-6 through 9-9 for component locations on modules AlA1A2
through AlAlA5 respectively. Troubleshoot the transponder set
9-13.  CHECKOUT.  Transponder set test set simulator
test set per table 9-2.
checkout is used as an aid to troubleshooting and to ensure
the unit is operating properly following repair. Circuit functions
Figure 9-3. Checkout Test Connections
9-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business