Click here to make tpub.com your Home Page

Page Title: INSPECTION REQUIREMENTS-CONT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

ELECTRICAL
SERVICE
CARD NO.
MAN
WORK
WORK UNIT
7 Day Inspection
INSPECTION
POWER
ON
IN
1-004
MIN
AREA
SYSTEM
SUB-SYS
REQUIREMENTS
(Cont'd from card 1-003)
WARNING
Dangerous and lethal voltage exists on the rear of Meter and
Control Panel 1A3. Use only one hand, with extreme caution,
when making the following checks.
0010
I.
Remove protective screen on back of the rack.  On the rear of the Meter and
Control Panel 1A3, connect the alligator clip on the insulated test lead to the
ground bar located at the top rear of the rack. Momentarily touch the probe tip to
terminal H on the rear of the VAR relay board. HLV lamp should light.
CARD NO.
WORK AREAS
TYPE MECH RQR
MECH NO.
CARD TIME
PUBLICATION
T.O. 31W2-4-203-6WC-1
NUMBER
T.M. 11-6130-363-14-1/2
1-004
0020

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business