Click here to make tpub.com your Home Page

Page Title: INSPECTION REQUIREMENTS-CONT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

ELECTRICAL
SERVICE
CARD NO.
MAN
WORK
WORK UNIT
7 Day Inspection
INSPECTION
POWER
ON
IN
1-003
MIN
AREA
SYSTEM
SUB-SYS
REQUIREMENTS
0015
G.
Remove power from rectifier 1PS3 by placing AC INPUT circuit breaker in
the OFF position. RFA lamp on the Meter and Control Panel should now be lit, and both
meters on this panel should indicate the same values observed in step B. On rectifiers
1PS1 and 1PS2 the ammeter should each indicate approximately half the current indicated
on the Meter and Control Panel ammeter and the voltmeter indication should remain
unchanged.
H.
Restore power to rectifier 1PS3 by placing AC INPUT circuit breaker in
ON position. RFA lamp on the Meter and Control Panel should now be off.
(Cont'd on next card)
T.O. 31W2-4-203-6WC-1
T.M. 11-6130-363-14-1/2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business