Page Title: INSPECTION REQUIREMENTS-CONT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

ELECTRICAL
SERVICE
CARD NO.
MAN
WORK
WORK UNIT
7 Day Inspection
INSPECTION
POWER
ON
IN
1-002
MIN
AREA
SYSTEM
SUB-SYS
REQUIREMENTS
A.
To perform some of these checks, an insulated test lead (at least two feet
long) with an insulated alligator clip on one end an insulated probe on the other end will be
required.
0025
B.
With Power Supply Set in normal operation, note the readings on all panel
meters and check that none of the fault indicators are lit.
C.
Remove power from rectifier 1PS1 by placing AC INPUT circuit breaker in
OFF position. RFA lamp on the Meter and Control Panel should now be lit, and both meters
on this panel should indicate the same values observed in step B. On rectifiers 1PS2 and
1PS3 the ammeters should each indicate approximately half the current indicated on the
Meter and Control Panel ammeter, and the voltmeter indication should remain unchanged.
(Cont'd on next card)
T.O. 31W2-4-203-6WC-1
T.M. 11-6130-363-14-1/2