Click here to make tpub.com your Home Page

Page Title: INSPECTION REQUIREMENTS-CONT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

ELECTRICAL
SERVICE
CARD NO.
MAN
WORK
WORK UNIT
7 Day Inspection
INSPECTION
POWER
ON
IN
1-002
MIN
AREA
SYSTEM
SUB-SYS
REQUIREMENTS
1.
Power Supply Set 42656-1 performance with simulated failure of each rectifier
(1PS1, 1PS2, and 1PS3), and operational check of ailure indicator lamps.
f
NOTE
These checks interrupt normal operation of the Power Supply Set
but do not affect the operation of the equipment being supplied from
this source unless a defect exists in the Power Supply Set and the
battery is weak.
CARD NO.
WORK AREAS
TYPE MECH RQR
MECH NO.
CARD TIME
PUBLICATION
T.O. 31W2-4-203-6WC-1
NUMBER
T.M. 11-6130-363-14-1/2
1-002
0055

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business