TM 11-5995-208-24&P-1
INSULATION BREAKDOWN/LEAKAGE TEST (CONT)
FIRST COAXIAL CABLE PROCEDURE
,
WARNING
Make sure test cable stub (1) is properly grounded to prevent test leads from touching
while testing. Death or serious injury to personnel can result from electrical shock.
NOTE
The ground rod and clamp are part of Breakdown Test Set AN/GSM-6. The test cable
stub must be fabricated from a spare adapter cable. (See appendix E for fabrication
procedure.)
3-34
|