INSULATION BREAKDOWN/LEAKAGE TEST
(CONT)
1.
Secure ground rod (2) into ground.
2.
Connect test point (3) to tinned center conductor (4) of first coaxial cable.
3.
Tightly wrap the guard wire (5) around coaxial dielectric (6).
4.
Tightly wrap a length of bare copper wire around first coaxial braid (7), then second
coaxial braid (8), and second center conductor (9).
WARNING
Make sure that cable test stub is properly grounded. Death or serious injury could result
from electrical shock when equipment is in operation.
5.
Extend free end of bare copper wire (10) to ground clamp (11), and secure it properly.
WARNING
Make sure the AN/GSM-6 is properly grounded. Death or serious injury could result
from electrical shock when equipment is in operation.
6.
Connect AN/GSM-6 ground cable (12) to ground clamp (1 1).
7.
Connect cable to be tested (13) to connector cap (14) of test cable stub (l).
8.
Mate caps (15).
WARNING
Twin coaxial cable assembly under test must be capped at the other end. Death or
serious injury to personnel could result from electrical shock.
Twin coaxial adapter cable must not be connected at the other end.
9.  Cap twin coax cable assembly (16).
10. Perform Starting Procedures on the AN/GSM-6(17) as outlined in TM 11-6625-273-12.
3-35