Click here to make tpub.com your Home Page

Page Title: Section IV PERFORMANCE STANDARDS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-5995-208-24P-1
Section IV PERFORMANCE STANDARDS
GENERAL
All cables returned to general support for maintenance action, and all repaired cables, should
undergo an inspection and insulation breakdown/leakage test.
The inspection entails performing all the PMCS items on pages 2-5 and 2-6. Cables passing this
inspection will then undergo an insulation breakdown/leakage test.
INSULATION BREAKDOWN/LEAKAGE TEST
Special environmental conditions should be adhered to when performing this test. Make sure all
testing is performed in a room or area approved by your safety officer.
TOOLS AND TEST EQUIPMENT: Electronic Equipment Tool Kit TK-100/G
Insulation Breakdown Test Set AN/GSM-6
Cable test stub
PERSONNEL REQUIRED: Two technicians
WARNING
Extremely high voltages exist when using the Insulation Breakdown Test Set AN/GSM-6.
Voltages as high as 40,000 volts may exist at output cables, output terminals, and cable
under test. Don't take chances. Be extremely careful. Serious injury or death may result
if you are not careful.
Never perform this test alone.
3-32

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business