|
|
TM11-5895-932-14&P
company. A list of equipment manuals is included
troubleshooting is brought about in an effort to
in appendix A.
restore communications, a faulty or incorrect
c. Reference Publications Reference publications
diagram can add hours onto the time of the
which should be included in the station records are
communications outage. Simple fault location
those manuals, documents and other data which
becomes a long drawn out procedure when a faulty
provide background, standards, or testing in-
drawing complicates it even more. Plant-in-place
formation. A list of these types of documents are
records must be accurate and complete prior to
included in appendix A.
time of the failure which interrupts communications.
d. Locally Prepared Data. Locally prepared
b. Equipment Manuals. The equipment manuals
data which is included as part of station records
which come under the heading of station records
are the patch board labels. labels on the power
are all manuals, commercial and military, that
load centers denoting circuit breaker application,
cover the individual items of station equipment.
any simplified patching diagram placed on patch
These items of equipment are either mounted in a
bays, and trouble logs. In general, any instruction
rack or, in the case of the red/black isolators, are
or aid to operation and troubleshooting of the
whole equipment racks. They are generally not
equipment can be considered part of the station
built by the installation/engineering agency but
procured as a separate item from a separate
records.
Section II. PATCHING OPERATIONS
(4) Technique. Develop
the
habit
of
rechecking your cord and plug positions just prior
a. The communication lines or paths that run
to completing the patch. Set the patch up with the
through the PTF are provided with patch boards
cable plugs only loosely set into the patch jacks.
which are connected between equipments and at
Then recheck the signal flow prior to plugging in
the line entrance and exit points. The patch boards
the idle sections: then plug in idle section fully;
are equipped with jacks that allow for either a
and finally complete the patch by setting in (or
parallel circuit connection for monitoring (MON) or
throwing) the plugs to the active line section
a series connection which opens the circuit and
simultaneously.
connects another circuit in its place. The series
(5) Prohibitions. Although the PTF was
jacks on the patch boards are used for testing and
designed to minimize the chances that red and
temporarily
circuit
paths for
rearranging
black circuits can be patched together, operators
troubleshooting and for the restoration of com-
should especially be alert to this possibility. Red
munications.
circuits must not be patched to black circuits. The
b. Successful patching requires knowledge of the
electrical Isolation of circuits provided by the
circuits and equipments, a technique that comes
red/black isolator cabinets must not be ignored.
from practice, and adherence to certain
precautionary measures.
(1) Circuit Knowledge. Knowledge of the
Examples of typical patch cord connections are
circuits and the type of signals they handle is
provided here to illustrate connections for patch-
essential for proper patching. Like signals have to
ing-in substitute equipment. PTF personnel
be patched to like signals. Signal paths must be
should examine the diagrams to understand the
maintained, i.e., output from one item of equip-
principles involved.
ment must go into the input of the equipment
a. Modem Substitution (fig. 3-1). This patch
patched to.
removes the modem on circuit number 2 and
(2) Operational Spares. Operation spare lines
substitutes a spare modem from circuit number 21.
and equipment must be maintained. Standby
At bay 1.7, a multicircuit patch cord is connected
equipment maintained in these spare circuits are
from the COMP jack of channel 2 to the MODEM
used when patching around a defective item.
jack of channel (circuit) 21. On the vf frame and
(3) Precautions. Patches should not be made
patch bay 1.9, two 2-wire patch cords connect the
haphazardly, without thought to the interruption
modem transmit and receive lines from circuit 21
of traffic. Always know what is on the circuit to be
to the lines of circuit 2.
interrupted. When possible, coordinate with others
affected so that when circuits are patched no
traffic is being passed.
3-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |