|
|
TM 11-5895-1012-10
action to clear the problem,
responsible
Technical Control Facility of the source of the trouble,
action taken, and complete station records in accord-
ance with established procedures.
(9) If, after maintenance personnel have checked
the equipment, the source of trouble is not at the local
station, notify the responsible TCF so that fault iso-
lation may continue at points closer to the signal
(10) Standby to assist in patching
or
other fault isolation tests if it should be necessary.
(11) If noise is not present, then the source of
trouble is somewhere between this point and the com-
plaining subscriber. This includes the local station
transmit multiplex and transmission media equipment
Noise Burst on multiplexed through circuit, fault isolation flow chart (sheet 1 of 2)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |