Click here to make tpub.com your Home Page

Page Title: PACKING PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

T.O. 31W2-2GSC24-2
TM 11-5805-688-14-1
NAVELEX 0967-LP-545-3011
11. Disconnect power cable from primary power
14.
Carefully move multiplexer set from rack
source and from multiplexer et.
and place multiplexer set on a suitable work bench or
surface.
12. Disconnect
remote
alarms
cable
from
multiplexer set and disconnect all input/output data and
15.
Install pair of slide assemblies removed
timing signal cables from multiplexer set.
from multiplexer set at time of initial installation.  Use
seven screws on each slide assembly.
13. Support multiplexer set as necessary and
remove 12 screws and washers securing two rack-
16.
Verify that all captive screws on front
mounting flanges to electronic equipment rack. Retain
panel and top panel of multiplexer set are securely
mounting hardware.
fastened.
17. Place multiplexer set and power cable in
shipping container and prepare equipment for shipment.
Change 1 3-59

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business