Click here to make tpub.com your Home Page

Page Title: AUTOLOAD PERFORMANCE TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

T.O. 31S5-4-308-l
TM  11-5805-663-14-13
NAVELEX 0967-464-0010
6 - 1 7 .  AUTOLOAD PERFORMANCE TEST.
i. Type in:
There are no performance test tables specif-
ASSIGN BOE (C/R)
ically for the autoload function of the Pro-
c e s s o r .  If the autoload function can be
TTY prints: >
j.
accomplished as described in paragraph
At the Switch Group, type in:
6-15, then the autoload function meets
DUMP, 0, IDFFF, XXXX(CR)
minimum performance standards.
NOTE: This should be a valid
start address for SSP.
6-18. PARALLEL I/O PERFORMANCE TEST.
There are no performance test tables specif-
At the ACOC Group, type in:
ically for the Parallel I/O. To determine if
D U M P , 0. 7FFF, XXXX(CR)
the Parallel I/O is functioning properly,
NOTE: This should be a
valid
perform the PFD/Clock, Alarm Control, and
start address for
SSP.
VF Communication Link tests in Section III,
k. Tape unit A6 will move
forward re-
Chapter 6 of the appropriate group technical
cording information from core
area specified
manual (T.O. 31W2-2G-271 for the Switch
in step j.
Group, T.O. 31W2-2G-281 for the ACOC
1. When tape unit A6 stops TTY prints > .
Group).
Depress ON LINE switch to OFF and depress
REWIND switch. Depress REWIND switch
6-19. MODEM CONTROLLER PERFORMANCE
once more to complete the rewind sequence.
TEST. There are no performance test tables
specifically for the Modem Controller. To
m .  Remove the tape from unit A6 and
determine if the Modem Controller is func-
s a v e .  This is a program dump from Core
tioning properly, perform the VF Communi-
Memory used to restore the Core Memory at
cations Link test in Section III, Chapter 6
completion of the Processor and Core Mem-
of the appropriate group technical manual
ory performance tests (refer to paragraph
(T.O. 31W2-2G-271 for the Switch Group:
6-16).
T.O. 31W2-2G-281 for the ACOC Group).
6-16. Restoring Core Memory. After per-
forming required performance test(s), restore
6-20. I/O CONTROLLER (SWITCH GROUP
Core Memory program dumped onto tape in
ONLY) PERFORMANCE TEST. There are no
paragraph 6-15, as follows:
performance test tables specifically for the
I/O Controller.  To determine if the I/O
a .  Place the tape, containing core mem-
Controller is functioning properly, perform
ory information, onto Mag Tape Unit Al.
the RMR, RSJ, and CCL tests in Section III,
Thread this tape, following instructions on
Chapter 6 of T.O. 31W2-2G-271.
front panel of tape transport.
b. Depress LOAD switch. When tape
6-21. VOLTAGE REQUIREMENTS AND
motion halts, depress LOAD switch once
SOURCES.
more.
6-22. All dc voltage requirements for the
C.  W h e n t a p e m o t i o n h a l t s , L O A D i n d i -
Processor and Core Memory are provided by
cator lights.
Multiple Power Supplies 1 and 2. The dc
operating voltages required by the various
d. Depress ON LINE switch to ON,
PC cards are listed in Table 6-9.
e .  On Program Maintenance Panel,
6-23. ALIGNMENT.
press reset switch and then load switch.
6-24. Adjustment procedures for the CM
f. When tape motion halts, press run
MSA 2.75 volt dc power supply should be
switch.
performed on each CM MSA PC card. The
Switch Group contains four BSM's and the
g -  Tape will move forward loading its
ACOC Group contains three BSM's each of
contents back into core memory.
which includes a CM MSA PC card. Each

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business