|
|
TM 32-5410-215-14&P
CHAPTER 3
OPERATING INSTRUCTIONS
Section I. CONTROLS AND INSTRUMENTS
5410-217-14&P for a complete description of the shelter
controls.
the electrical controls for the RPSF. Refer to TM 32-
Table 3-1. Electrical Controls
Control
Figure
Description
Function
Ceiling lights
3, figure 1-4
ON/OFF circuit breaker
Controls phase A power to ceiling lights.
Provides
circuit overload protection.
Blackout circuit
2, figure 1-4
ON/OFF switch
Controls blackout circuit.
Blackout
1, figure 1-4
Receptacle
Provides for blackout actuator cable input.
Blackout
8, figure 1-4
Circuit relay
ON position permits interlock switch to control shelter
light circuit. OFF position will bypass interlock switch.
Blackout
Door switch
Activates blackout light when door is opened.
Phase A
4, figure 1-4
Circuit breaker
Controls power to phase A receptacles.
Provides
circuit overload protection.
Phase A
7, figure 1-4
Receptacle
Provides phase A power to external circuits.
Phase B
4, figure 1-4
Circuit breaker
Controls power to phase B receptacles.
Provides
circuit overload protection.
Phase B
6, figure 1-4
Receptacle
Provides phase B power to external circuits.
Phase C
4, figure 1-4
Circuit breaker
Controls power to phase C receptacles.
Provides
circuit overload protection.
Phase C
Receptacle
Provides phase C power to external circuits.
Work console
19, figure E-7
Plug
Controls power to work console circuit.
Work console
30, figure E-7
Receptacle
Provides power to external circuits.
circuit
Work console,
9, figure E-9
ON/OFF switch
Controls power to work console light unit.
light unit
3-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |