2-5 TOOLS, TEST EQUIPMENT AND MATERIALS
2-6 INSTALLATION AND CONNECTIONS. Installation
of the RPSF is limited to ground or vehicular mounting
and connecting the additional equipment required for
tools required.
There are no special tools, test
operation. Refer to TM 32-5410-217-14&P for shelter
equipment or materials required. Refer to TM 32-5410-
installation, cabling and wiring interconnections.
217-14&P for tools, test equipment and materials
required to install the RPSF on vehicles.
Table 2-1. Installation Tools
Item
Purpose
Applicable publication
Tool Kit, Electronic
As required for
SC 5180-91-CL-S21
Equipment TK-100/G
installation
Tool Kit, Electronic
As required for
SC 5180-91-CL-R07
Equipment TK-105/G
installation
Multimeter AN/USM-223
Test electrical circuits
TM 11-6625-654-14
Section V. PRELIMINARY ADJUSTMENT OF EQUIPMENT
adjustment of the equipment is limited to release of
2-7
EXTENT OF PRELIMINARY CHECKS AND
tiedowns (paragraph 3-2).
ADJUSTMENTS. Refer to TM 32-5410-217-14&P for
preliminary adjustments of the shelter.