Click here to make tpub.com your Home Page

Page Title: REMOVAL
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-4240-302-30&P-1
2-7 COMPARTMENT CONTROL MODULE (CONT).
LOCATION
ITEM
ACTION
Nonmetallic tubing
Replace tubing if torn or broken (item 2,
App B, bulk materials).
Fabricate replacement tubing (3) (item 2,
app B, bulk materials). Cut to same length
as tubing being replaced.
INSTALLATION
1. Install loop clamp (9) on tube (7) if removed.
2. Install hose clamps (3 and 4) on tubes
(7 and 8) if removed.
3. Position pressure switch S6 (5) between tubing
(7 and 8) with switch terminals pointing away
from the thermal flasher DS12 (10) and low
and high markings toward the front panel (11).
4. Install tube (7) on low side of switch and tube
(8) on high side.
5. Slide hose clamps (3 and 4) over tube
connections. Install electrical connectors (6).
Refer to wiring diagram (p. 2-99).
6. Install washer (2) and screw (1).
7. Reassemble CCM (p. 2-77).
2-78

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business