Click here to make tpub.com your Home Page

Page Title: Transmitter Power and Pulse Adjustments
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-667-45/NAVAIR 16-30APM123-2/TO 33A1-3-367-22
4-4. Transmitter Power and Pulse Ad-
a Standard Test Equipment. The following
justments
chart lists the Army test equipment required for
the tests.
NOTE
See paragraph 4-7 when using
AN/TPM-25A.
Test equipment
Technical manual
Multimeter ME 26B/U.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TM 11-6625-200-15
Wattmeter AN/URM-98 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TM 11-6625-433-15
Oscilloscope AN/USM-281 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TM 11-6625-1703-15
Test Facilities Set Transponder Test Set AN/APM-270(V) . . . . . . . . . . . . . . . . . . . . . . . . . .
TM 11-6625-1644-12/NAV-
A I R 16-30APM270-1 To
38D9-62-5-1
b. Test Setup. Instructions for the applicable
A16TP2. Adjust variable capacitor A16C12 for a
test setup are provided in c and d below. Test
maximum peaked meter indication. The voltage
should be -16 volts dc minimum.
point location is shown in figure 3-6 and ad-
justment control location in figure 3-7.
(11) Disconnect the dc probe from A16TP2,
c. Preliminary  Procedure. The preliminary
and set the ME-26B/U SELECTOR switch to
(+).
procedure is given in (1) through (12) below. The
final adjustment is in d below.
(12) Connect the dc probe to test point
A16TP3. Adjust variable capacitors A16C17 and
NOTE
A16C18 for a maximum peaked meter indication.
Wattometer AN/URM-98 should be
The voltage should be 6 volts dc, minimum.
warmed up for 15 minutes before final
d. Find Power Level Adjustments.
adjustments are made.
(1) Turn on the equipment, and permit a
(1) Remove the transmitter from its case
15 minute warmup. Connect test point A13TP2
(ground to A4TP5 (fig. 3-6).
(2) Use the test setup in figure 3-1.
(2) Set the test set FUNCTION control
(3) Set the ME-26B/U SELECTOR switch
SYSTEM, MODE switch at 1, and ISLS switch
at(+) and RANGE switch at 300V.
to OFF.
(4) Apply power to the test set, and set the
(3) Set the Summation Bridge TS-779A/U
test set PRESS TO TEST switch at LOCK and
RANGE switch at O DBM.
MODE switch at 1.
Waveguide
Probe
( 4 ) Disconnect
(5) Perform the procedure in paragraph 4-3c.
M X - 2 1 4 4 A / U from the AN/APM-123(V)l
(6) Disconnect the dc probe from test point
PROBE connection. Adjust the TS-779A/U
A14TP3, and set the ME-26B/U RANGE switch
meter to zero with the ZERO control.
at 30V.
(5) Reconnect the MX-2144A/U to the
(7) Connect the dc probe to test point
AN/APM-123(V)l PROBE connection. Observe
A16TP4. Adjust control A16A2R1 for +18.05
the meter indication. The power should be
volts.
6dbm.
(8) Disconnect the dc probe from A16TP4
NOTE
and set the ME-26B/U SELECTOR switch to
I f necessary: adjust the test set
().
A16A1C2 and power controls A16R6
(9) Connect the de probe to test point
( f i g . 3-7) to obtain performance
A16TP1. Adjust variable capacitor A16C6 for a
standards.
maximum peak meter indication. The voltage
should be 16 volts dc minimum.
(6) Disconnect test point A13TP2 (ground
(10) Connect the dc probe to test point
from A4TP5, and connect it to test point A4TP4.
4-2
Change 5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business