Click here to make tpub.com your Home Page

Page Title: Adjustment
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4930-233-14
TM 4930-14/1
SKID SUB ASSEMBLY
5-5. TRANSFER PUMP - REPAIR/ADJUST (Cont.)
e. Adjustment
NOTE
This adjustment can also be made to correct leaking that occurs around packing adjustment slot
(1) Run pump for approximately 5 minutes to allow teflon packings to form evenly.
(2) Allow cylinder and plunger to cool.
(3) Apply a maximum of 30 psi air pressure. If pump does not start or if leakage occurs, adjustment is required.
(4) Loosen adapter (21) to a point where its holes line up with a hole on bushing (23).
CAUTION
Do not overtighten bushing as this will cause piston assembly to bind. If pump did not operate
during run-in, skip steps (5) and (6).
(5) Place a rod through holes and hand tighten to drive bushing assembly into pump casting, thereby tightening
packings.
(6) Remove rod and repeat run-in. If pump doesn't operate proceed. If pump operates without leakage, go to
step (9).
5-22

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business