Click here to make tpub.com your Home Page

Page Title: Section II. MAINTENANCE PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4930-233-14
TM 4930-14/1
Section II. MAINTENANCE PROCEDURES
ENCLOSURE AND SKID ASSEMBLY
5-2. ENCLOSURE AND SKID ASSEMBLY - REPLACE
This task covers:
a.
Removal
b.
Installation
INITIAL SET-UP:
Tools
Special Environmental Conditions
General Mechanics Tool Box
Trailer parked on level ground
(Section III, Item 1, App B)
and blocked.
Hoist
a.
Removal
(1)
Attach hoist at four lifting eyes (1).
(2)
Remove six nuts (2), six washers (3), six screws (4) and six beveled washers (5).
(3)
Lift skid sub assembly (6) off of trailer assembly (7) and place on firm, level ground.
b.
Installation
(1)
Attach hoist at four lifting eyes (1).
(2)
Lift skid sub assembly (6) onto trailer assembly (7) and install six beveled washers (5), six screws (4), six
lockwashers (3) and six nuts (2).
5-9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business