Click here to make tpub.com your Home Page

Page Title: Trailer Assembly
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4930-233-14
TM 4930-14/1
b.
Trailer Assembly
1
Lubricate front jack leg through lubrication hole near cranking handle.
2
Coat rear jack slide and screw to provide smooth operation.
3
Be sure that master brake cylinder is full. Capacity is 5/16 qt. (0.3 liter).
4
WHEEL BEARINGS. Every 500 hours, remove wheels, inspect all parts, replace damaged or worn
parts, repack bearings and reassemble (para 4-58).
KEY
REFILL
EXPECTED TEMPERATURES
ABOVE +32
F  +40 TO-10
F
F
0 TO -66
F
F
CAPACITY
INTERVALS
ABOVE 0
C
+5 TO-23
C
C
-18 TO -60
C
C
(APP)
OE/HDO
OIL, Engine
(MIL-L-2104)
2 qt (1.9L)
OE/HDO 30
OEA
OEA
Intervals
OEA/APG-PD-1
OIL, Engine, Subzero
given are in
BFS
Brake Fluid, Silicone
hours of
(MIL-B-46176)
Brake Master Cylinder
5/16 qt (0.3L)
HB
HB
HB
normal
GAA
GREASE, Automotive
All
operation
(MIL-G-10924)
and Artillery
Temperatures
3-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business