Click here to make tpub.com your Home Page

Page Title: OPERATOR/CREW PREVENTIVE MAINTENANCE CHECKS AND SERVICES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

OPERATOR/CREW PREVENTIVE MAINTENANCE CHECKS AND SERVICES
B Before
D During
A After
W Weekly
M Monthly
ITEMS TO BE INSPECTED
INTERVAL
PROCEDURE:  Check for and have repaired, filled or
Equipment is not ready/
ITEM
adjusted as needed.
AVAILABLE IF:
NO.
D
MQ
A
AR
NOTE
PERFORM WEEKLY AS WELL AS BEFORE PMCS' IF:
s
a.
You are the assigned operator but have not operated
equipment since the last weekly.
b.
You are operating the equipment for the first time.
1
GENERAL
a.
Visually check for loose wiring, 4ds wed piping or hoses.
b.
Look for evidence of fluid leakage (oil, fuel, coolant).
Class III leaks or any fuel
leakages found.
2
ENGINE CRANKCASE
Check dipstick for proper level. Add oil, as necessary, to
Full mark. (At operating temperature, engine idling, 180-200F).
3
TRANSMISSION
Check dipstick for proper level. Add oil, as necessary, to
Full mark (At operating temperature, engine idling, 180-200F).
4
HYDRAULIC SYSTEM
a. Check hydraulic tank level sight gage (blade lowered and
engine off). Add oil as required.
b. Check hoses and connections for condition and leaks.
Class III leaks found.
39

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business