Click here to make tpub.com your Home Page

Page Title: ASSEMBLY:
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

DOZER VALVE:
Check Plug Installation
Dozer Valve End Cover
3.
Install new seals on port relief body and port
relief seat and reassemble cylinder port reliefs.
4.
Install outer spool seal (item 46) and quad
ASSEMBLY:
spool seal (item 18) on seal plate (item 19). Gently slide
1.
Before reassembling dozer valve assembly,
over spool (item 31) being careful not to catch seals on
clean all parts and wash with clean solvent. New seals
sharp corners of spool.
should be lightly oiled before installation.
5.
Reassemble stop collar, spring, balls and
2.
Reassemble check poppet.(item 47) and
float positioner. Spring must be depressed to assemble
spring (item 48). Install new seal (item 49) on check
float positioner. Install retaining ring (item 24).
plug and replace plug.
Spool Assembly
Poppet Installation
60-2.7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business