|
|
DOZER VALVE:
Check Plug Installation
Dozer Valve End Cover
3.
Install new seals on port relief body and port
relief seat and reassemble cylinder port reliefs.
4.
Install outer spool seal (item 46) and quad
ASSEMBLY:
spool seal (item 18) on seal plate (item 19). Gently slide
1.
Before reassembling dozer valve assembly,
over spool (item 31) being careful not to catch seals on
clean all parts and wash with clean solvent. New seals
sharp corners of spool.
should be lightly oiled before installation.
5.
Reassemble stop collar, spring, balls and
2.
Reassemble check poppet.(item 47) and
float positioner. Spring must be depressed to assemble
spring (item 48). Install new seal (item 49) on check
float positioner. Install retaining ring (item 24).
plug and replace plug.
Spool Assembly
Poppet Installation
60-2.7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |