|
|
3208 INDUSTRIAL AND MARINE ENGINES
DISASSEMBLY AND ASSEMBLY
FUEL INJECTION PUMP HOUSING
3. Put the shaft (4) in the housing. Slide the
levers (6) and the lever (5) on to the shaft in
the order shown. Push the shaft into posi-
tion in the housing.
4. Install the screw that holds the lever (5) to
the shaft. Tighten the screw to a torque of
24 2 lb.in. (27.7 2.3 cm.kg).
5. Put the shaft assembly (7) in the housing.
Slide the levers (9) and the lever assembly
(8) on to the shaft in the order shown. Push
the shaft assembly into position in the
housing.
6. Install the screw that holds the lever assem-
bly (8) to the shaft assembly. Tighten the
screw to a torque of 24 2 lb. in. (27.7
2.3 mkg).
end by:
a) make adjustments to the sleeve con-
trol shafts (see TESTING AND ADJUSTING)
b) install fuel transfer pump
c) connection of governor to fuel injec-
tion pump housing
d) install fuel injection pumps
36
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |