TM 5-3835-222-BD
Materials/Tools:
Tool Kit
Hose Fittings
Hose, Hydraulic, High-Pressure
Tape
Saw
Vise
Procedural Steps:
a. Remove the damaged tube.
original tube and may be easier to install.
e. Install the assembled hose.
f. Check that the hydraulic reservoir level is at least at the minimum operating level. If this level
low, refer to para 8-13 and fill the reservoir as needed.
g. Operate all hydraulic subsystems (except those that may still be damaged) to remove air from
the system. Check carefully for fluid leaks. Tighten leaking fittings.
h . Check the hydraulic reservoir again to ensure a sufficient hydraulic fluid level. If this level is low,
refer to para 8-13 and fill the reservoir as needed.
9. Record the BDAR action taken. When the mission is completed, as soon as practicable, repair
using standard maintenance procedures.
8-7.2 High-Pressure Tube Repair - Permaswaging.
Personnel/Time Required:
1 soldier - 1.5 hrs.
Materials/Tools:
Tool Kit
Ruler
Pen
Repair Kit, Tube
8-12
|