TM 32-5865-069-24&P
Pre-Test Inspection - Continued
Table 5-2.
Assembly/
Inspection
Normal
method
Procedure
indication
component
Visual
CCA A11
Inspect for discolored,
a thru c must be
a.
free of defects.
loose, broken or burned
components and connections.
b.
Inspect for cold solder
joints, and excessive
so1der.
c. Inspect board for cracks,
chips and breaks.
(2) Start ATESP/UUT testing by entering the following command at the
TEST (the TPT number from table 5-l)PV1 ret
TEST 5051600PV1 ret
TEST 5052332PV1 ret
examples -
etc.
(3) Based on the program entry points, described in table 5-1, select and
execute one of the following options:
NOTE
The first entry point must be used for the first test of the UUT.
(a) If the first entry point is to be used, press PROCEED.
(b) Enter the appropriate entry point; press RETURN.
MARNING
HIGH VOLTAGES are used during test. Extreme caution should be exer-
cised. These HIGH VOLTAGES could cause death.
(4) Follow the instructions as they appear on the VDT until the program is
complete.