Click here to make tpub.com your Home Page

Page Title: Section V. INTERMEDIATE SUPPORT TEST PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 32-5811-024-14&P
(d) Remove four power supply module mounting screws and lift from unit.
b. Assembly. Digital processor test set assembly consists of installing the blower and power supply module.
(1) Blower installation.
(a) Position blower (from top of unit) onto heat sink and reconnect tagged blower wires as indicated.
(b) Secure blower to heat sink by tightening four mounting screws from bottom of unit.
(c) Position safety cover on bottom of heat sink and secure with 14 mounting screws.
(d) Position power supply top cover on heat sink (top side) and secure with 12 mounting screws.
(e) Reinstall top and bottom covers.
(2) Power supply module installation.
NOTE
Place a thin layer of silicone heat sink grease between the power supply module and heat sink
before installing the module.
(a) Position power supply module to mounting surface and secure with four screws.
(b) Connect tagged power supply module wires to terminals as indicated.
(c) Position power supply cover and secure with 12 mounting screws.
(d) Reinstall top cover.
Section V. INTERMEDIATE SUPPORT TEST PROCEDURES
6-9. General.
This section provides intermediate support testing procedures for the digital processor test set. The test procedures
indicate whether a new or repaired unit is capable of performing its assigned mission.
6-7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business